Keeping timber in use for longer means thinking about its next use from the start. At CircularBuild 2026, our workshop looked at what this means for the people designing, constructing and eventually adapting or dismantling a building.
Timber on buildings has the potential to be reused, repaired and recycled, but the options available will depend on how the building has been the designed and the timber specified, installed and cared for. A connection that cannot be taken apart, damage during construction or missing product information can all make future reuse more difficult.
Our workshop, Closing the Loop: Designing with Timber for a Circular Economy, gave participants a shared project to work through: a four-storey workspace and community building with a glulam frame, cross-laminated timber (CLT) floors and roof, timber façade cassettes and demountable partitions.
The brief called for responsibly sourced, traceable timber and a building that would serve its original purpose for at least 30 years. After that, the aim was to adapt it or carefully dismantle it, keeping timber elements in use wherever possible.
Participants worked in three groups, considering design, construction and handover, and deconstruction. Their notes brought out some practical questions about how to make this work.
Get the brief right
The design group started with the client’s brief. What does the client want to achieve, what are the risks, and is the proposed approach feasible? Bringing the relevant people into the project early would help answer these questions before decisions become difficult or expensive to change.
Helping clients understand the consequences of their choices was another point raised. Cost, availability and construction programmes all need to be considered when deciding how a building will be put together and how its components might be used again.
The group also asked whether a shorter design life could make sense for some elements. Different parts of a building may need to change at different times. Planning for that at the design stage could make replacement and adaptation more straightforward.
Protect the timber and keep useful records
For the construction group, the use of responsibly sourced timber such as that certified under the PEFC scheme was considered an important specification consideration. Moisture management during construction was a particular concern, and there was agreement for the need for effective storage and handling procedures to prevent damage that could reduce service life and hence the potential for reuse.
When it came to the handover of the completed building, participants agreed that comprehensive records of materials used would need to be passed onto the user. In relation to timber, this should include details of species, strength grade, any treatments and connectors. Digital product passports were suggested as a way to retain this information, although participants questioned whether the necessary data-recording skills were always available. Whatever system is used, records need to reflect what was actually built and remain useful to the people responsible for the building later on.
As well as the records of the materials, the group agreed that an effective maintenance and monitoring programme is essential in order to avoid any damage or deterioration of timber members in the building during its use. All recognised that the use of remote moisture sensors as a potential solution to moisture management in mass timber buildings.
Prepare for reuse
The deconstruction group noted that relatively few CLT buildings were yet being seen at the end of their life. As its use becomes more widespread, they felt the industry needed to prepare for how these buildings would be dismantled and their timber recovered.
Priority was given to retaining valuable, reusable components. Participants discussed recovery techniques and rates, as well as options for repurposing timber in non-structural applications.
There were also questions about testing, insurance and certification. Moisture, fire and acoustic performance were among the considerations raised when assessing timber for another use. These are practical issues that need to be addressed if recovered materials are to be specified with confidence.
From responsible sourcing to the next project
For PEFC, responsible sourcing belongs in the same conversation as the care and future use of timber. The workshop considered both where timber comes from and what happens to it after it arrives on site.
The groups returned to the need for collaboration between all parties at the start of project to ensure all potential issues are addressed, followed by the careful handling of materials during construction and then the collation and handover of reliable information to the building owner. A future project team will need to know what timber is available, its condition and how it can be recovered. The choices made on today’s projects can help give them those answers.
Thank you to everyone who took part and shared their views on what needs to happen to make timber reuse a more practical option.
Learn more about timber reuse
Timber reuse is also on the agenda for our upcoming CPD, Busting Timber Myths with Dr Pablo van der Lugt. Join us online on 5 March 2027 at 1pm GMT for a free session covering circularity and the potential for reusing timber, alongside carbon, forestry and timber supply. Participants will receive a CPD certificate.